|
Before:
- enp1s0: wan
- enp2s0: lan (with VLANs)
- enp3s0: mgt
Changes in this patch:
- wan is moved to VLAN id 5
- bond0 is created, replacing lan as lower device for VLANs
- mgt config is removed (could be reconfigured as a VLAN, and
made a available on a switch port)
- all 3 ports are enslaved in bond0
From the switch towards the space server load-balance algorithm
src-dst-ip* is used.
From the space server towards the switch L3+L4 is used.
Therefore a single IP pair will always use the same 1G
from the swith to the space server, a client therefore
needs to multiplex over multiple IPs in order to
*) The src-dst-ip algorithm on the switch hasn't been
tested with IPv6 yet. Hopefully we can find a better
switch at some point, so we can include the L4 ports in
the hashing on the switch.
Signed-off-by: Asbjørn Sloth Tønnesen <asbjorn@labitat.dk>
|